Log both the standard price (your planned price from the purchase order) and the delivered unit price (the actual price from the supplier invoice) on every receiving event to catch variance and keep your stock costs accurate.
- The standard price is the expected price for a unit set on the purchase order or pricing sheet before delivery; the delivered unit price is the actual amount paid for a unit from the supplier invoice.
- The gap between the two is your variance: paying more than planned is unfavorable, paying less is favorable — the comparison itself is the analysis.
- Record the delivered unit price line by line at receiving (not as a bulk total), flag any line where the two prices differ, and note the reason if known.
- Receiving staff capture the delivered unit price and flag mismatches; purchasing owns and updates the standard price; managers use both numbers together; finance reconciles with both.
- When the same SKU shows the same variance repeatedly, the standard price has drifted — update it upward or downward so it stays a useful baseline.
You receive a delivery. The box matches the purchase order. The quantity matches. Then you look at the invoice and the unit price is not what you expected. That gap between what you planned and what you actually paid is the single most useful number hiding in your paperwork.
Most shops record one price and move on. That works until someone asks why your margins slipped, or why a supplier looks expensive this month, or why your cost of goods does not tie to your bank statements. The fix is simple: log two prices on every receiving event. One is your standard price. The other is your delivered unit price.
Both numbers matter. Each answers a different question. This post walks you through what each price is, where it comes from, who checks it, and how to record both without slowing down your receiving dock.
What you are actually logging
The standard price is your expectation. It is the price you planned to pay for a unit of material before the delivery arrived. OpenStax defines it plainly: the standard price is the expected price paid for materials, measured for each unit.
The delivered unit price is the reality. It is the actual amount you paid for this delivery's unit of stock.
One number lives on your purchase order or your pricing sheet. The other lives on the invoice. When you log both at the moment of receiving, you capture the gap while you still remember the details of the delivery.
Why bother with two numbers? Because the gap between them tells you something. If you paid less than you planned, your variance is favorable. If you paid more, your variance is unfavorable. The comparison itself is the analysis. OpenStax spells out the favorable case: when the actual price paid for a unit of material falls below the standard price, the variance is favorable.
You do not need a finance degree to use this. You need a receiving form with two fields and a habit of filling both in.
Why a standard price exists at all
A standard price is a deliberate choice. Someone on your team decides what you expect to pay for a unit, writes it down, and uses it as a reference point for months. That reference point does not stay still on its own.
Prices move. OpenStax says it directly: "It is not reasonable to expect the price of all materials and labor to remain constant for 12 months."
So the standard price is a planning tool, not a promise. It is the price you budgeted, the price you negotiated, or the price you benchmarked when you set your plan. It gives you a baseline to measure against. Without it, you have nothing to compare your invoice to. You would just pay whatever the supplier asks and never know if that number is good or bad.
The standard price also has a second job: it motivates. When your team knows the expected price, people have a target to work toward. OpenStax illustrates this with a production-rate standard rather than a price: "The plant's middle level of management thought the standard should be 100 gallons every 55 minutes, while the top management of the company thought that the consulting firm's standard would provide more motivation to the employees."
That debate shows you what a standard really is. It is a target people organize around. The exact number matters less than the fact that everyone agrees to use it and measure against it.
Here is what this looks like in your shop. You buy coffee beans by the pound. You set a standard price for each pound based on last season's contract. A year later, the invoice shows a higher number. You are not surprised, because you have a standard to compare against. You can tell your manager exactly how much more you paid for each pound and estimate the impact on your cost of goods.
The two prices side by side
Here is a compact comparison of the two fields you will log on every receiving event.
| Field | What it is | Where it comes from | When you log it |
|---|---|---|---|
| Standard price | Expected price paid for materials, set for each unit | Purchase order or your pricing sheet, set before delivery | Already on the paperwork before the truck arrives |
| Delivered unit price | Actual amount paid for materials, measured for each unit | Supplier invoice for this delivery | At receiving, when you check the invoice against the goods |
That table covers the core of the job. The rest of this post explains how to fill those fields cleanly, how to handle the times they disagree, and how to use both numbers later.
How to receive stock with both prices in hand
Receiving is where the two prices meet. You have the goods in front of you, the purchase order in one hand, and the invoice in the other. This is the moment to capture the delivered unit price and compare it to the standard.
Square's inventory workflow describes how receiving works in practice: "Receive stock: When you receive stock, you can add stock units by individual item or across multiple items in bulk."
That choice — individual items or bulk — matters for your price logging. If you receive a mixed pallet with several SKUs at different prices, receiving item by item keeps a price on every line. Receiving item by item takes longer, but it gives you a delivered unit price for every line. If your goal is variance tracking, the slower path is usually worth it.
Here is a practical sequence you can follow:
- Open the purchase order. Confirm the standard price is on it for each line.
- Count or scan the goods. Confirm the quantity matches.
- Pull up the supplier invoice. Read the unit price on each line.
- Enter the delivered unit price on your receiving record, line by line.
- Flag any line where the two prices differ.
Step five is where the value shows up. You do not need to calculate a formal variance on the dock. You just need to notice the difference and record it. The formal analysis can happen later, at your desk, with time to think.
If you run a small operation without a formal receiving system, a simple two-column spreadsheet works. Column one holds the standard price. Column two holds the delivered unit price. One row for each line item. That is enough to start.
What to do when the two prices disagree
Disagreement is normal. In fact, it is the point. If the two prices always matched, you would not need both.
When the delivered unit price comes in higher than your standard, you have an unfavorable variance. You paid a higher unit cost than you planned. This could be a supplier price hike, a rush order surcharge, a smaller order quantity that lost a volume break, or a simple mistake on the invoice.
When the delivered unit price comes in lower, you have a favorable variance. You paid less than planned. This might mean you found a better supplier, you caught a discount, or your standard price is outdated and needs updating.
Here is a question worth asking: which price do you use for your inventory records? This depends on your accounting method and your bookkeeper's preference, and the sources reviewed here do not settle it. Ask your accountant which convention your business follows.
For day-to-day receiving, the answer is simpler: log both. Store both. Downstream systems can use whichever number your process requires, but only if both are captured at the dock.
A word of caution on standards that drift. Because prices genuinely move over a year, your standard price will go stale. When you notice a pattern of unfavorable variances on the same SKU across several deliveries, that is a signal. It may be time to update the standard price on your standard purchase order document. Otherwise every future delivery will show a variance that is really just an outdated baseline.
On the flip side, if you keep logging favorable variances on the same item for months, your standard is too high. Update it downward. A standard that nobody revisits stops being useful. It becomes paperwork.
Where cost structure feeds your prices
Your standard price does not live alone. It sits inside a larger picture of what a unit costs you. Understanding that picture helps you set better standards and read your variances with more confidence.
Clear Estimates explains cost structure: "Parts can have any combination of material, labor, and subcontractor cost."
That line applies beyond construction. Any part or product you buy has components. The raw material cost is one. If you assemble or finish it in-house, your labor is another. If you outsource a step, that is a subcontractor cost. Your delivered unit price covers the material piece of that puzzle. Your standard price covers your expectation for that same piece.
When you see an unfavorable variance on a delivered unit price, ask which component moved. Did the supplier raise the material cost? Did they add a handling fee? Did a subcontracted step get passed through to you? Each answer points to a different fix.
This is also where a small price change on your own products matters. OpenStax poses a scenario worth thinking about: "What would happen if she purchased the new machine to realize the variable cost savings and also raised her price by just $0.20?"
That question shows the two-way lever. You can respond to a cost increase by finding savings elsewhere, raising your own price, or both. Knowing your delivered unit price against your standard gives you the data to decide which lever to pull and how hard.
The checklist for your receiving station
Print this and tape it near where deliveries land. It is short on purpose.
- Confirm the standard price is on the purchase order for every line.
- Verify quantity matches before you sign anything.
- Read the unit price on the supplier invoice for each line.
- Record the delivered unit price line by line, not as a bulk total.
- Note the reason if you know it — price change, discount, error.
- Route flagged lines to whoever owns purchasing for review.
- Revisit the standard price when the same SKU shows the same variance repeatedly.
None of this takes long once the habit is in place. The first few deliveries feel slow because you are building the habit. After that, the two-price check becomes as automatic as counting boxes.
Role by role: who does what
Not everyone in your shop touches both prices. Here is how the work usually splits.
Receiving staff are on the front line. Your job is to capture the delivered unit price accurately and flag mismatches. You do not decide whether to change the standard. You record what you see and pass it up.
Purchasing or the buyer owns the standard price. This person sets it on the purchase order, reviews variances, and decides when a standard needs updating. When receiving flags a repeated variance, this is who follows up with the supplier.
The manager uses both numbers together. Variances across suppliers and SKUs feed decisions about contracts, order quantities, and pricing on your own shelf. A pattern of unfavorable variances on a key item is a conversation to have with your supplier.
Finance or your bookkeeper receives the data and turns it into reports. They need both numbers to reconcile cost of goods and explain margin changes. Give them clean, line-level data and their job gets easier.
If your shop is small enough that one person wears all four hats, the discipline still matters. Log both prices even when nobody is watching. The record pays off the day you need it.
Handling edge cases
A few situations come up regularly. Here is how to think about them.
Bulk deliveries with mixed prices. You receive a pallet of ten different items, each at a different price. Receive item by item instead. It takes a few more minutes and preserves your delivered unit price for every line.
Partial deliveries. The invoice covers three of the five items on the order. Log the delivered unit price for the three you received. Leave the other two open on the purchase order until they arrive. Do not guess the price for goods you do not have.
Credits and returns. If you send a shipment back and receive a credit, the delivered unit price on your original receiving record may no longer reflect what you ultimately paid. Record the credit against the same line so your records stay true.
Promotional or one-time pricing. A supplier offers a deal for this order only. Log the delivered unit price as it appears on the invoice. That number is your reality for this delivery. Decide later whether the standard price should move, or whether this deal was a one-off that does not justify changing your baseline.
Invoice errors. Sometimes the delivered unit price on the invoice does not match the price quoted on the order or the price printed on the packing slip. Do not quietly accept it. Flag it before you pay. An invoice error caught at receiving is a five-minute fix. Caught two weeks later, it is an afternoon.
Related guides: Supplier price rises in federal contracts: 2 limits · Shelf sale: 2 entries to post, sale price and cost of goods · Shop price rise: 3 figures to check before you start.
Common questions
Do I need both prices if my supplier never changes prices?
Yes. You cannot know prices never change until you compare them. If your variances stay at zero for months, that is valuable information — it tells you your standard is accurate and your supplier is stable. You only learn that by logging both numbers.
What if the standard price is missing from the purchase order?
That is a gap worth fixing. A purchase order without a standard price gives receiving nothing to compare against. Ask whoever creates the order to add the expected unit price on every line. Until that habit is in place, look up the last standard from your records and note it on the receiving form yourself.
Does this work for services as well as physical goods?
The core idea applies to anything you buy at a unit-based rate. The sources reviewed here focus on materials and parts, so the mechanics of service pricing may differ in your accounting setup. Your bookkeeper can confirm how to log a delivered unit price for a service line.
How often should I update a standard price?
There is no fixed schedule. Update it when the variances tell you to. If the same SKU consistently shows a variance in one direction across several deliveries, the standard has drifted from reality. Revise it then.
Who should I ask when I am unsure which price goes into my books?
Your accountant or bookkeeper. They know which convention your accounting method requires and how your system expects the data to arrive. Getting that answer once saves you from reformatting months of records later.
Bringing it together
Two prices. One is what you planned. One is what you paid. Log both on every delivery and you build a record that answers real questions: which suppliers hold their prices, which items are drifting, where your margins are leaking, and when it is time to renegotiate or reprice.
The practice is not complicated. A field for the standard price on your purchase order. A field for the delivered unit price on your receiving form. A quick flag when they differ. A periodic review to keep the standard honest.
Start with your highest-volume items. Those are the ones where a gap between the two prices adds up fastest. Get the two-price habit running there, then extend it across the rest of your catalog. Within a few receiving cycles you will have something you did not have before: a clear, line-level view of what you expected to pay and what you actually paid, captured at the moment it mattered.
Keying in a supplier delivery? Supplier Invoice to Shopify Stock Workbook turns the invoice lines you type into Shopify's inventory import file with new on-hand counts, and lists cost changes and lines worth a second look.