Bypass the header links
StockroomLane

Stock count conditions: 3 tests before count day

By
StockroomLane Editorial Team
Posted
Sources checked
Time to read
10 min read

How this guide was made

Written by AI software on a local computer, with a source shown beside each statement and the facts looked over once by a second AI system from an outside firm. Humans did not write, edit or review it. Editorial standards

Before a stock count, test noise, label readability and control of glare under the conditions your team will count in.

Key takeaways

  • Noise test: Stand one metre from a colleague and speak normally. Note where speech is hard to hear.
  • Sight test: Walk your count zones under count-day lighting and try to read each label from counting distance. Note every bay that fails, including glare and contrast problems.
  • Control test: Find the window controls and ask who is allowed to touch them.
  • Fix before the count: Move unreadable labels, reduce noise in counting zones, and hand over blind controls to the team.
  • Leave for later: Cosmetic issues, budget redesigns, and anything that means closing the shop mid-count.

Who this is for

This is for shop owners, stockroom managers and floor staff who run a full stock count.

You already know how to count. You have a system. You have a sheet or an app. This post is not about your system. It is about the room your system runs in.

A count day is a long day. People walk aisles. They call out numbers to each other. They read small print on cartons. They work under whatever lighting the space happens to have. If any of that fights you, the count suffers.

Three conditions are worth checking before your next count. Start with a walk through your counting zones. Use what you find to plan the fixes before count day.

Condition one: can people talk without shouting

Stock counts are a team job. One person reads. One writes. Or two people count a bay and reconcile. That only works if speech travels.

Here is a simple test you can run right now. Stand one metre from a colleague. Ask them something in a normal voice. Can they hear you? Now ask whether you would need to raise your voice.

WorkSafeBC states that, as a guideline, if you are within 1 metre of another person at work and have to shout to be heard, the noise level is likely excessive. This is a rough guide, not a complete noise assessment.

Read that rule for yourself: WorkSafeBC, Noise.

If you fail that test in your stockroom, plan how people will confirm numbers. People may need to walk over rather than rely on a call they cannot hear clearly.

Why noise gets worse on count day

Count day is not a normal day. The noise profile changes.

You may have roll cages in. You may have compressors running. Trolleys roll on hard floor. People talk more. Boxes hit the floor. Anything that is normally quiet now has company.

If your stockroom is already close to the shouting test on a normal day, count day may make communication harder. That is worth knowing before the day, not during it.

What to do if you fail the test

The first move is simple. Reduce what you can. Move the noisy work out of the counting zone. Ask deliveries to come earlier or later. Shut the compressor if you can shut it for the session. Put the trolleys to one side.

The second move is to change how you communicate. Agree that numbers are written down, not shouted. Agree that anything unclear gets walked over and confirmed face to face. Agree that before you move to the next bay, the count is settled.

The third move is longer term. If the space itself is noisy, you have a workplace condition, not a count-day problem. In Great Britain, the 2005 Noise Regulations replaced the 1989 Noise Regulations and introduced new requirements for action to be taken by employers. Those rules also require employers to take action to protect workers at levels of noise 5 dB(A) lower than in the 1989 Regulations. And they require health surveillance, meaning hearing checks, for workers regularly exposed above 85 dB(A).

You can read the detail here: Health and Safety Executive, Regulations.

That is a separate conversation from your count. But if you fail the shouting test today, it is a conversation worth starting.

Condition two: can people read what is in front of them

The second test is sight. Counting is reading. You read a shelf label. You read a barcode. You read a carton print. You read your own sheet. All of that depends on light.

CCOHS makes two points that matter here. Too much or too little reflected light makes objects hard to see. And too little contrast makes it hard to distinguish an object from the background.

Both show up on a count day.

Too much reflected light shows up as glare. A shiny label under a bare lamp turns white. You cannot read the print. You tilt the sheet. You still cannot read it. You guess.

Too little light shows up in the back of the stockroom. The far aisle is always darker. The bottom shelf is always darker. The corner behind the racking is always darker. Those are exactly the places where a miscount hides.

Read the full guidance: CCOHS, Lighting Ergonomics - General.

How to run the sight test

Walk your count zones with the lighting exactly as it will be on the day. Do not turn anything on that will not be on for the count. Do not leave anything on that will be off.

At each bay, try to read the label from where a counter would stand. If you have to step closer, lean in, or tilt your head to catch the light, that bay fails.

Then look at contrast. Can you separate the label from the shelf edge behind it? Can you separate a white box from a white label? If two things blend together, they may be harder to distinguish under time pressure.

Then look at your own sheet or screen. Under the same light, can you write without squinting? Can you check your figures without moving to find a better spot?

Mark the bays that fail. You now have a list. That list is what you fix before count day.

What to do if you fail the test

Start with the free fixes. Move the thing you need to read. If a label sits in shadow, move the label. If a shelf edge disappears, change the label colour so it separates from the shelf. If a white label sits on a white box, use a darker label.

For related label checks, see the guide to retail barcode labels.

Then deal with the light itself. If one area is too bright, the fix may be to tone it down rather than add more. If one area is too dark, the fix may be a task lamp on that aisle for the count only.

Daylight is its own variable. CCOHS notes that the amount of daylight entering the workplace can be controlled with tinted glass, window blinds, curtains, and awnings. If your stockroom has a window and the sun moves during the day, your light will move during the day. Plan for that.

Condition three: who controls the light adjustments

The third test follows from the second. If light needs adjusting during the day, who does it?

CCOHS says that where possible, individuals should have control over items such as curtains and blinds to help manage brightness and glare. That is a design point about workplaces in general. On a count day, it becomes a practical question for your floor.

Here is the test. Stand at the window. Can you reach the blind? Can anyone on the count team reach it? Or is it fixed, or up a ladder, or behind racking?

If nobody can adjust it, a glare problem may persist during the count. Check how the team can change the light before relying on that bay for readable labels.

The deeper question

The real question is not the blind itself. It is whether the people doing the count have any authority to change the conditions around them.

Can a counter say, this bay is unreadable, let us fix it now? Or does everyone work around problems until the count is over?

Agree which small changes the team can make and which need a decision from whoever owns the floor layout.

So test this too. Pick one bay. Ask your team what they would change about it. Then ask whether they are allowed to change it. The gap between those two answers is your third finding.

Putting the three tests together

Here is the sequence you can run before your next count.

First, the noise test. Note where in the space speech is hard to hear. Plan how counters will confirm unclear calls there.

Second, the sight test. Walk the count zones under count-day lighting. Try to read each label from counting distance. Try to separate label from shelf and shelf from wall. Note every bay that fails.

Third, the control test. Find the window controls. Find any dimmer or switch. Ask who is allowed to touch them. Note whether your team can adjust conditions as the day moves.

Write the three lists down. You now know what will fight you on the day.

Then fix. Move the noise. Fix the labels. Hand over the blinds. Settle anything that needs a decision with whoever signs off on your floor layout.

Only then count.

For the counting process itself, see physical inventory reconciliation.

Illustrative example: a shop checks its count zones

Picture a small independent shop with a sales floor and a stockroom behind it. The owner plans a full count for a Sunday, when the shop is closed and the team can work without customers.

On the Thursday before, she walks the space with a colleague.

They start in the stockroom. She stands a metre away and says a shelf code in a normal voice. He cannot hear it. She writes down that zone as a noise problem.

Then they walk the sales floor under the lights that will be on for the count. Glare makes a window bay unreadable, and its blind is out of reach.

Before Sunday, they move noisy work out of the counting zone, reposition the labels and arrange access to the blind. They repeat the checks before counting.

What to fix, and what to leave

Not every finding needs a fix before count day. Some do.

Fix before the count:

  • Any bay where a label cannot be read from counting distance.
  • Any zone where a normal voice will not carry one metre.
  • Any glare that arrives during your planned count hours.
  • Any adjustment nobody is allowed to make.

Leave for later:

  • Cosmetic issues that do not affect reading or hearing.
  • Redesigns that need a budget cycle.
  • Anything that means closing the shop mid-count.

The rule is simple. If it could affect reading or hearing on the day, address it now. Otherwise, put it on a list and move on.

Pre-count walk checklist

  1. Noise — stand one metre from a colleague, speak normally, note any zone where you would have to shout.
  2. Lighting — read every label in your count zones from where a counter would stand, note every failure.
  3. Contrast — check that labels separate from shelf edges and from the products behind them.
  4. Glare — check the window bays at the time of day your count will run, note any washout.
  5. Control — confirm someone on the team can reach and adjust blinds, curtains or switches during the count.
  6. Authority — confirm your team may change small things on the floor as they go, without waiting for sign-off.

If all six pass, you have checked these count-day conditions. If any fail, you know what to fix. A count day should be about numbers, not about fighting the room.

Today, walk one count zone with a colleague, note what prevents clear reading or hearing, and agree who will fix it before count day.

FAQ

Do we need a noise meter to run the noise test?

No, the voice check is a rough first pass. A proper assessment is a longer job and belongs to your wider workplace noise duties, not to your count-day prep.

What if only one bay fails the lighting test?

Fix that bay before you count it. The point of the walk is to find failures while you still have time. One bad bay does not cancel the count. It just needs a label moved or a lamp brought over before you start.

Should we count in the dark to keep light levels steady?

No, count under the light you will actually use. A count done in conditions the team cannot repeat next time teaches you nothing about your process. Use the real lighting, fix what fails, and record the conditions so next count matches this one.

Who decides what counts as a fix worth doing before the day?

Whoever owns the floor layout and signs off on changes to it decides. Your team should be able to raise a find and get a quick yes. If that route does not exist in your shop, build it before the next count.

Can we test all this on the same day as the count?

You can, but that leaves less time to fix problems. The value of the three tests is the gap between finding a problem and fixing it. Run them a few days ahead. Then the count day is only a count.

Sources

Keep reading

See every guide